Friday, May 7, 2010

Bathroom - Part 2

This is the cement board around the tub. You can see the plumbing for the faucet, knob and shower.

This is the plumbing for the sink. You can see the edge of the tub on the bottom right. The vanity will run from the tub to the wall.


The hole in the wall to the left is for a 7 inch deep cabinet. Storage has been a major problem in this bathroom but the toilet sits beneath the window you see on the right so we didn't want a cabinet sticking out making it so we would bump our heads. Dale came up with the great idea of recessing the cabinet so it will only stick out 3 inches. Didn't I say he was wonderful?

He only has one more thing to do before he can start on the flooring. I get more nervous as we begin finishing. Decorating is not my forte' and I worry that I will not like the granite top with the tile we chose. We will have 12" tiles on the floor and 6" tiles on the wall going about half-way up in the room and to the ceiling in the tub area. We chose a light tile (vanilla) since the bathroom is small but chose a darker color (mocha) to do accent lines.


2 comments:

  1. Can't wait to see the finished product!!! :-p

    ReplyDelete
  2. I think what you chose will look fine.
    Brother Dale has a "nack" for things like that!!! Look forward to seeing the finished project...

    ReplyDelete